Skip to main content
Img 9326

Tarik have been requested to assist the East Side Developers engineering team carry out the Bathometric surveys required for the first phase of the  and sea Defence to be  prepared before the placing of cassions can be carried out. This will be carried out by our new addition ANAIS equipped by sophisticated sonar equipment onboard her.  The survey will entail shallow draft capability and close to the shore lines. 

ANAIS is equipped with a moonpool that provides an attachment for the sonar equipment’s.
Tarik are proud to have been chosen  once more for this important mission hoping to be able crown our several projects thought our long history in Gibraltar Port developments.
Img 9325